
Johannesburg’s new mayor, Herman Mashaba, spent Sunday at one of the city’s key water sites, promising to tackle the supply problems that have left parts of South Africa’s biggest city with low pressure or dry taps.
Mashaba visited the Brixton Reservoir with senior managers from Johannesburg Water, TimesLIVE reported. It was one of his first public engagements since he returned as mayor on Friday under a coalition deal.
What is working and what is not
According to the update Mashaba gave, as reported by TimesLIVE:
- Brixton: the new reservoir and water tower are complete and operating.
- Crosby: the backup pump station is complete and operating, but the main pump station still needs equipment.
- Hursthill 1: out of normal operation because of structural defects. A contractor has been appointed and repairs are due to start in January 2027.
- Hursthill 2: running at about 40% of capacity, with repairs 48% complete.
- Hector Norris Pump Station: 98% complete.
“Not looking for long speeches”
Mashaba has promised to restore basic services, repair infrastructure, deal with hijacked buildings and strengthen law enforcement, the report said.
“Residents are not looking for a mayor who delivers long speeches or a council that spends its time fighting among itself,” he told councillors after his election, according to TimesLIVE.
Why it matters
Water cuts have become one of the most common complaints in Johannesburg, especially in higher-lying suburbs. The city has also gone through seven mayors since 2021 as coalitions collapsed, so residents will be watching whether this administration lasts long enough to finish the repairs.
The Democratic Alliance, which won the most votes in the city on 4 November but is in opposition, has said it will hold the new administration to account.




